Prefabricated Timber & CLT Solutions for Developers

Multi-unit residential • Commercial buildings • Fast delivery across Europe

300+ projects in 8 European countries

Trusted by developers and architects across Europe

30+

Years Experience

8+

Export Markets

Hundreds

Completed Projects

±1mm

CNC Precision

Operating in

NorwaySwedenNetherlandsSwitzerlandIrelandLatvia

What We Build

Multi-Unit Residential

Apartment blocks and townhouses — 2-5 storeys.

  • Timber frame or hybrid CLT construction
  • Factory-fitted windows and cladding
  • 3-5 days assembly per floor
  • Airtightness below n50 = 0.6
  • Fixed contract price — zero escalation
Download brochure

CLT Building Solutions

3-8 storey structures with CLT walls, floors, and cores.

  • Structural CLT walls, floors, and cores
  • Hybrid timber frame + CLT systems
  • Max panel: 13,800 × 3,100 × 400mm
  • CE marked (ETA-21/0014)
  • Full service: engineering → production → assembly
Download price list

Infill Panels & Facade Systems

Timber infill for steel/concrete frames or facade renovation.

  • Infill panels for multi-storey frames
  • Factory-fitted windows available
  • Fire resistance up to EI 120
  • Renovation panels for EU Wave compliance
  • Fast installation on existing structures
Download technical specification and price list

Two Technologies. One Factory. One Contract.

Most timber construction suppliers offer either panel frame or CLT. Not both. ZTC manufactures both systems under one roof — and combines them into hybrid structures that deliver the structural performance of CLT with the cost efficiency of timber frame.

For your project, that means one supplier, one timeline, and one point of accountability.

Timber Frame Panels

  • Insulated wall, floor and roof panels
  • Hundegger CNC precision: ±1mm tolerance
  • Factory-fitted windows available
  • Cellulose / wood fibre insulation
  • U-values from 0.12 W/m²K

CLT Structural Systems

  • In-house CLT press
  • Max panel size: 13,800 × 3,100 × 400mm
  • 3, 5, or 7 layer configurations
  • Formaldehyde-free adhesive
  • Visible-grade CLT for interior finish

Hybrid Capability: CLT structural core + timber frame insulated envelope = 15-20% cost reduction vs. pure CLT, with superior thermal performance.

European Presence

Projects Across Europe

Loading map...

Active Markets

Total486+

Why Choose ZTC

Fast Production & Delivery

Structural assembly: 3-5 days per floor. Weather-tight in weeks, not months. Earlier interior start. Earlier rental income.

Fixed Contract Price

Zero escalation. No material surcharges. Final price is the contract price. Your financial model stays intact.

CNC Precision + CE Mark

±1mm tolerance. CE marked kits (ETA-21/0014). Compliant with Eurocodes. Building inspection ready in all EU/EEA countries.

30 Years European Delivery

Hundreds of completed projects across Scandinavia, Benelux, and Western Europe. We know local codes, logistics, and site requirements.

Project References

See our timber and CLT construction projects — from factory production to completed buildings.

Timber Frame Production

Timber Frame Production

Factory manufacturing process

CLT Building Assembly

CLT Building Assembly

On-site installation

Completed Project Tour

Completed Project Tour

Finished timber building

ZTC awards and recognition

Awards & Recognition

Internationally awarded 10+ times

2024

Excellence in Timber Engineering

2023

Best Timber Construction Project

2023

European Sustainable Building Award

2022

Nordic Architecture Recognition

2022

Innovation in Prefab Construction

2021

Quality & Precision Excellence

2021

Architectural Design Award

2020

Builder of the Year

2020

Sustainability Leadership

2019

Green Building Pioneer Award

Let's Discuss Your Project

Send us your project drawings or concept description. Our engineering team will review feasibility and provide a preliminary assessment within 10 business days.

Upload drawings (optional) — PDF, DWG, IFC

Supported files: PDF, DWG, IFC

Direct Contact

Meža iela 22, Vītoliņi, Jelgavas novads, LV-3017

Email Our Team

What Happens Next

  • We review your project documents
  • We assess technical feasibility
  • We prepare a preliminary response
  • We reply within 10 business days
Project InquiryView Portfolio